If there is a large gap between three quotations for the same job, the problem is not in the price but in the scope. Find out what the cheap quotation does not include; the answer is usually there.
In waterproofing and strengthening work, the outcome depends on the quality of the workmanship far more than on the material used. The same product can give results ranging from twenty years to two years in the hands of two different teams. For this reason the real decision in this work is not a product decision but a decision about the firm.
In this article we explain what to look at when obtaining quotations, how to genuinely compare three different offers, the clauses that should be in the contract and the warning signs. Our aim is to place your decision on solid ground beyond price.
![]()
If there is a large gap between three quotations for the same job, the problem is not in the price but in the scope. Find out what the cheap quotation does not include; the answer is usually there.
Ahmet Toka, General Manager
A good quotation process begins with a well-defined need. Gathering the following information before calling firms in both speeds up your process and makes the quotations comparable.
When this information is shared, the quotations that come in describe the same job and comparison becomes meaningful.
The survey is also the first opportunity you have to assess the firm. In a good survey the following happen:
For our approach you can request a survey from our contact page.
Three quotations have arrived and the prices differ. To make the comparison meaningful, each quotation needs to state the following headings explicitly:
Once these items are clear, it often emerges that the quotation that looked cheap contains less work.
Obtaining a reference list is easy; verifying it gives you real information.
The contract should state in writing: the scope and limits of the work, the names of the products to be used, the application thickness and consumption, the tests to be carried out, the programme and works schedule, the payment plan (the advance proportion should be reasonable), the warranty period and its scope, and how a change of scope will be handled.
Warning signs:
You can find the scope of our services on our services page, and our approach to waterproofing and strengthening on our waterproofing and structural strengthening pages.
Give your structures complete protection against the harmful effects of water and damp with Likit İzolasyon! With our foundation, roof, wet area and façade waterproofing services we make your buildings durable and long-lasting. Get in touch now for professional service!
Service details →We make your structures safe and durable with our structural strengthening services. Choose Likit İzolasyon for detailed analysis and professional application methods!
Service details →Protect your structures against external factors with floor coating applications from Likit İzolasyon. Discover our solutions offering hygiene, durability and aesthetics!
Service details →We give your structures durability and an attractive finish with concrete maintenance and repair. Protect your structures with Likit İzolasyon's solutions that prevent corrosion and deliver long service life!
Service details →Three quotations are generally sufficient and give a sound basis for comparison. More than that lengthens the process and makes the decision harder. What matters is not the number but that the quotations describe the same scope.
Not in itself; but you must understand why it is cheap. The difference may come from efficient working, or from surface preparation being skipped. Comparing the scope items line by line makes that distinction clear.
Unless its scope is defined in writing, it carries limited meaning. A good warranty states clearly the period, the situations covered, the exclusions and the response time. The firm is also expected to still be trading throughout that period; its track record is relevant here.
A reasonable advance for procuring materials is normal; but asking for a large part of the total before the work starts is risky. The sound approach is to tie payment to stages of the work and leave the final instalment until after handover and inspection.
Yes. A contract is needed not only for disputes but for clarifying the scope. A scope set down in writing confirms that both sides understand the same job and reduces surprises during the work.
Check that the surface preparation is being done by the method in the contract, that the products used are, from their packaging, the products quoted, that the consumption matches the calculation and that the tests are being carried out. Keeping a photographic record is in the interest of both you and the contractor.
With over 25 years of field experience, let us determine the right solution for your building together. Contact us for a survey and quotation.
Over 25 years of field experience in waterproofing, floor coatings and structural strengthening. This article is based on applications encountered on site and the standards currently in force.